Here We are in September 2026! It's hard to believe the year is almost over already!
Today, We take an extensive look at some of the Projects that were thought of, but ultimately cancelled before they could be funded. We will also be showcasing all of the Yard Locations around the System! Use the main map file as reference.
CANCELLED PLANS
There have been seven cancelled projects under De Island Transportation. Some expansions, some service plans, but ultimately, they were axed before moving forward. The following plans are those that have been confirmed to be permanently off the table. Their general reasonings have also been included.
1. ( B ) Train Expansion to Bainbridge
The ( B ) has been discussed of being extended north of Bastion to Bainbridge. It was discussed to include 3 new stations: 12th Av, Dulles St, and Bainbridge. The project was cancelled before funding could be allotted due to prioritizing the completion of the third track project for ( 9 ) Train service to Bastion. Including additional stations North of Bastion would inhibit Express ( 9 ) service and current ( B ) Train service.
Bainbridge area will continue to use the Railroad Station for 6th Av instead of a Subway Expansion.
2. ( 5 ) Train Express to High-Plains
You may notice that the ( 5 ) Train R.o.W continues beyond Midtown-Financial. During construction, it was designed for the express service to continue at least until High-Plains. While the Line still sees rush hour express service via the ( A ), the ( 5 ) was originally scheduled to run this segment. It was cut back to Midtown due to ridership patterns preference. Ridership data showcases that ( A ) Train service suffices for now.
3. Du Pont Subway Line
Back during the time period when the entire Subway System was being planned, all of the counties were consulted on whether they would like to participate in the great subway project. Du Pont was the only County that rejected the notion. Initially, a six stop Branch West of Tilbury Station on the ( Z ) Train was planned to extend reach to Du Pont Regional Airport.
- Du Point Terminal* [Proposed Three Track Terminal]
- Greely Square [Island Platform]
- Burke Avenue [Side Platform]
- Flynn Street [Side Platform]
- Division Street* [Proposed Three Track Station]
- Lafayette* [Island Platform]
The asterisk Stations were proposed to facilitate rush hour express service if needed. Du Pont County did not believe the project was worth investing in. All counties have invested a percentage into expansion of service for their region, besides Du Pont. They believed their Bus and Railroad connections sufficed without turning Du Pont Av into a construction hellscape. Instead of exploring alternative construction options, the county doubled down on their stance and rejected any and all future propositions. De Island Transportation dropped the plan and as of today Du Pont County is now the most disconnected county from public transportation. It’s Bus System has not kept up with growing demand by housing one of the closest airports to the Broadway and Surf City region.
4. < 4 > Service
The < 4 > Train was a service that ran from Goodmen Halt to Hilltop via a right of way that has since been abandoned. Until recently, this route remained as a legacy route on the Map alongside all of the closed stations alongside it. Out of them all, only Reeves St remains albeit in a modified state. One Side Platform has been dismantled and service has been integrated into the Leighton Shuttle line instead. With the removal of this connector, The Passtow Parkway line is now completely cut off from the county of West Kill.
The Route was decommissioned due to lack of ridership. In its final decade of service the Western stations of the < 4 > were seeing single digit riders. Since then, the tunnels have been filled in to prevent trespassing. Nowadays < 4 > May show up sporadically as a route change for the ( 4 ) [Broome Blvd - Wotton Av, and West Farmworth - Southam Central short turn trips], but this is not an official passenger facing assignment.
5. ( 7 ) Train Express to Baisley
The 7 was supposed to be the express route for both Bayview and Beverley County. This plan was cancelled due to no funding for the Beverley segment express tracks. This would have sped up the travel immensely with only stops at Carterton Plaza and Alaster Av before reaching Hailridge. The plan would have been bottlenecked by a forced double track segment to Tengston Rd and ( 7 ) Trains would have to just pass by without stopping, preventing them from skipping any J Trains in front until after Carterton Plaza. The provisions have been filled in.
6. Continued Ocean Drive Shuttle
The third track for the Ocean Drive Subway was intended for Yard Moves and a Shuttle service if necessary. Since the project finished, the Shuttle line has not returned on the schedule and ( M ) Trains have been picking up the slack. Data shows that the Shuttle service would only have a savings of 3 minutes during rush hour and 5 minutes during off peak. The middle track sits underutilized.
7. Norwood Yard Subway usage
( V ) and ( Z ) Trains used to have a permanent home in Norwood Yards. The Railroad Division owns this yard and refused to negotiate future subway usage outside of a single track to transport equipment between these two routes. All other yard tracks are exclusively reserved for Railroad equipment now. Play Stadium Yard was constructed but this Yard will not be storing the two routes that lost their home. They will service the equipment there only.
------------------------------------------------------------------------------------
YARD LOCATIONS
Please see all of the Yard Locations for both the Northern and Southern Division of the Subway System! There are currently 11 Northern Yards and 6 Southern Yards.
The Black Lines that connect the Yard to the map indicate the direction the Yard Lead Tracks will allow you to take a Train out of the Yard.
NORTHERN DIVISION
- 180th Street Yard: ( 2 )

- Leighton Yard: ( Leighton Airport Shuttle )

- Wotton Av Yard [Upper & Lower Levels]: ( 2 ) ( 4 ) ( 9 ) ( B ) ( Strangford Shuttle)

- West Kill Yard: ( 1 ) < A > ( A ) ( K )

- Sequoyah Yard: ( 8 ) ( 11 )

- Passtow Gardens Yard: ( 11 )

- Penryn Yard: ( 2 ) ( 4 )

- Frost Yards: < A > ( A ) ( F ) < F >

- Seaside Yard: ( 1 ) ( A ) ( C ) ( Q ) ( W ) (Seaside Connection)

- Warwick Yard: ( 5 ) ( C ) ( Q ) ( W ) ( R )

- Westwood Yard: ( 6 ) < 6 >

SOUTHERN DIVISION
- Damascus Yard: ( D )

- Play Stadium Yard:( D )( E ) ( M )( Playland Local )

- Rivington Yard: ( 9 ) ( F ) ( G ) ( L )

- St Croix Yard: ( 3 ) ( 6 ) < 6 >

- Sutton Av Yard: < 7 > ( N ) ( M )

- Zahra Sq. Yard: < F > ( J ) ( 7 )

That about wraps us up for this week.
Be on the look out for the latest addition to the Passenger Ride Series coming to the De Island Transportation Youtube Channel. 